604.559.1411
A&G Creative Group
  • Our Work
    • Projects
    • Logos
  • About Us
  • Blog
  • Contact us
  • Website Design & Development
  • Digital Advertising & Marketing
    • Internet Marketing Services
    • Search Engine Optimization
    • Online Advertising
    • Social Media Management
    • Reputation Management
    • Monitoring & Reporting
  • Branding & Marketing
    • Marketing Strategy
    • Advertising Campaign Design
    • Print Design
    • Packaging Design
    • Trade Show Booth Design
    • Media Buying & Management
    • Branding
      • Logo Design
      • Brand Standards Guide
      • Brand Refresh & Rebranding
  • Menu Menu
Home1 / Our Work2 / Vision West Aluminum

Vision West Aluminum

With over 40 years in the glazing industry, Vision West Aluminum approached us to redesign their website to better reflect the experience, expertise, and quality behind their work. The new website showcases their skilled team, proven craftsmanship, and to better commitment to staying current with the latest glazing technologies and industry standards-creating a modern digital presence built on decades of experience.

Web Design, Brand Voice, Legacy Logo

Vision West Aluminum logo with a large stylized W and the text Over 40 years.

Legacy Logo

A computer monitor displaying the Vision West Aluminum website homepage, featuring an image of a modern building and the text Quality, craft and commitment is all we know.
A computer monitor displaying the Vision West Aluminum website homepage, featuring a high-rise building and the headline All in, all the time for every project!.
A computer monitor displaying the Vision West Aluminum website homepage, featuring a large commercial building and the text Dialed-in accuracy every time.
A computer monitor displaying the Vision West Aluminum website, featuring a hero image of a modern indoor pool area and text reading, The tough stuff is our wheelhouse.

Brand Voice

Computer monitor displaying a website page titled Services with a grid of six images showing architectural design, construction site logistics, and glass fabrication.
A computer monitor displaying a website section titled Key Industries featuring a grid of six architectural photos of commercial buildings.
Computer monitor displaying a website about manufacturing and installation services.
Computer monitor displaying a portfolio webpage titled Special Projects featuring the River Rock Casino & Resort.

Web Design

Web & Online

  • Website Design & Development
  • Internet Marketing Services
  • Search Engine Optimization
  • Online Advertising
  • Monitoring & Reporting
  • Reputation Management
  • Social Media Management

Marketing

  • Marketing Strategy
  • Advertising Campaign Design
  • Print Design
  • Packaging Design
  • Trade Show Booth Design
  • Media Buying & Management

Branding

  • Branding
  • Logo Design
  • Brand Refresh & Rebranding
  • Brand Standards Guide
© Copyright - a&g creative group | All rights reserved | #100 - 2250 Boundary Road Burnaby, BC  V5M 3Z3 | (604) 559-1411
Western Gasco A person wearing a welding helmet works on a project, surrounded by bright flying sparks. A close-up of sparks flying from industrial machinery, overlaid with the text Attention To Detail & Safety and Accuracy built into every detail. Blue Heron
Scroll to top